Chonburi – Swine II

Swine Waste to Energy operates two on-farm biogas projects at Eastern Labs farms in Chonburi.

Projects generate power for internal consumption of the farm.

Asia Biogas is currently negotiating the sale of these assets.

Swine Waste to Energy – ELG

Project Host

Eastern Farm # 1

Location

Chonburi, Thailand

Feedstock

Pig Manure

Production Capacity of Host

30,000 grower

Biogas Production per day

8,000 Nm3

Methane Production per Day

4,800 Nm3

Installed Capacity of Generators

1 MW

Electricity Production per Day

12,000 kWh

Number of Staff

5

Commercial Operation Date

January 2010